GURUFOCUS.COM » STOCK LIST » Utilities » Utilities - Regulated » Baraka Patenga Power Ltd (DHA:BPPL) » Definitions » Momentum Rank

Baraka Patenga Power (DHA:BPPL) Momentum Rank : 0 (As of Jun. 09, 2024)


View and export this data going back to 2021. Start your Free Trial

What is Baraka Patenga Power Momentum Rank?

Baraka Patenga Power has the Momentum Rank of 0.

For Momentum Rank, we considered the residual momentum concept that was widely studied by Blitz and his colleagues as well as by Nobel Prize laureates Fama and French. However, we did not find any significant differences in the performances of stocks with different ranks of residual momentum. Therefore, we use traditional momentum instead.

Momentum Rank is determined using the standardized momentum ratio and other momentum indicators. The standardized momentum ratio is the average of the performances from 12 months ago to 1 month ago and 6 months ago to 1 month ago, divided by the beta of the stock over the past 12 months. To calculate the momentum ratio today, we would use the average of the two performance numbers.

For momentum, we found that stock price performance does not have a monotonic correlation with the momentum ratio. The stocks with the highest momentum ratios perform worse than those at about the 70th percentile. Therefore, for the momentum rank, we ranked the stocks at about the 70th percentile of the momentum ratio as the highest at 10.

Please click GF Score to see more details on the GF Score's 5 Key Aspects of Analysis.


Baraka Patenga Power Momentum Rank Related Terms

Thank you for viewing the detailed overview of Baraka Patenga Power's Momentum Rank provided by GuruFocus.com. Please click on the following links to see related term pages.


Baraka Patenga Power (DHA:BPPL) Business Description

Comparable Companies
Traded in Other Exchanges
N/A
Address
Segunbagicha, 6/A/1 1st and 2nd Floor, Dhaka, BGD, 1000
Baraka Patenga Power Ltd is engaged in the business of setting up power plants for the generation and supply of electricity to the national grid of Bangladesh. It has introduced a desulfurization plant to the project to reduce sulfur emission at an acceptable low level.

Baraka Patenga Power (DHA:BPPL) Headlines

No Headlines