Mine Life Cycle - How Accurate Are the Resources Reported in Each Project Phase

Article's Main Image

This article about how to determine the accuracy level in each of the project phases of the mine life cycle is a great resource for investors in individual mining stocks. However, when you are investing in mining stocks through a Stock Based mineral ETF, I recommend you to read this article too.

A typical mining project goes through different phases which are collectively referred to as the mine life cycle. In the following table¹ you see a detailed description of the mine life cycle.

03May20171452471493841167.jpg

First, an exploration program is initiated to gather information about the potential presence of a mineable orebody. Exploration information is defined according to the CIM standards² as follows:

Exploration information means geological, geophysical, geochemical, sampling, drilling, trenching, analytical testing, assaying, mineralogical, metallurgical and other similar information concerning a particular property that is derived from activities undertaken to locate, investigate, define or delineate a mineral prospect or mineral deposit.

In the exploration phase the results of a drill program are reported under supervision of a qualified person² who will publish the first (and future) mineral resource estimate(s).

If the preliminary economic assessment indicates that the project could be economically viable, management will hire a consulting firm who will start with the preliminary feasibility study². Well-known consulting firms are: SRK Consulting, Tetra Tech, and Behre Dolbear.

When management concludes - based on the outcome of the preliminary feasibility study - that the resource has the potential to be extracted from the ore in a profitable manner, a consulting firm will be hired to complete the (bankable) feasibility study². This final feasibility study will include the engineering design.

After receiving the bankable feasibility study, management has to arrange the best possible project financing: this is one of the hardest tasks for management to complete. Therefore I always prefer to see a financial specialist in the management team who already has raised significant amounts of money in the past (although this is not a guarantee that the financing will be completed without any problems).

Finally, when management has secured the project financing, the company can start with the construction phase. There is a lot of uncertainty during the construction phase, which can have a negative impact on share prices. Declining share prices in the construction phase are often caused by costs over running from the original estimates from the bankable feasibility study. As estimating is not an exact science, keep the accuracy levels from the table below in mind! When (you suspect) additional financing is necessary always be very careful when holding these stocks, as their share prices often decline very fast. Alternatively however, these situations of very fast declining share prices could lead to ideal buying opportunities too.

If you are interested to find out how I use the accuracy levels from the table below for my own investment analysis, I refer you to the note at the bottom of this page on UndervaluedEquity.com.

As soon as the construction phase is over, the mine will be taken into production. This phase has to lead to one goal: profit from operations! Brownfield exploration can lead to an extended mine life.

Finally, the mine will be closed and the land must be returned to its pre-disturbance condition.

The Accuracy Level of the Resources Reported in Each Project Phase of the Mine Life Cycle

Project Phase Accuracy of Reported Resources
Exploration -
Preliminary Economic Assessment (PEA)
(also referred to as Economic Analysis)
30-40%
Preliminary Feasibility Study (PFS)
(also referred to as Pre-Feasibility Study)
20-30%
Bankable Feasibility Study (BFS)
(also referred to as Final Feasibility Study or Feasibility Study)
10-20%
Construction Phase 5-10%
Operations -
Closure -

¹ Image Source: http://www.gardguide.com/index.php/Chapter_4

² CIM Definition Standards